Newhouse Dig Diary – Day Five

In his final dig diary Dr Ryan Prescott updates us on the final day of the Newhouse excavation.

Day Five represented the final day of our excavations at Newhouse, and there was much still left to do before we wrapped up our work for the week.

Subscribe to our quarterly newsletter

We had found it quite difficult since Monday to find the cut of the ditches from the natural, despite the clarity of their profile from outside of the trenches. While we had the JCB back on site, we thought it would be worthwhile to cut a little deeper into the ditch cuts on both Trench 1 and Trench 2 to determine more about them and their relationship to each other. Certainly, in Trench 1, we seem to have been able to find the extent of the cut and were able to record its measurements and draw sketches which will help us better interpret the nature of the earthworks as a whole. From this, it would appear that the mound was predominantly natural but had been reworked with an accompanying ditch cut around its perimeter.

Again, with the aid of our JCB, we set to work backfilling the two trenches and making sure that the site was returned as much to the state it had been in prior to our arrival. After the welfare unit had been collected, we packed up the car with our equipment, and ensured that the finds would be safely transported back to the office ready for the next phase of our project. We also had a visit from the farmer who was able to point out some other features on the broader site that he had been aware, including a much smaller mound to the north in the adjacent field which had existed until it had been ploughed out some years before.

Now that the fieldwork has been completed, we hope to bring you more information in the coming weeks about what we have found. We are hoping that the picture will become clearer in the post-excavation phase, but Newhouse has undoubtedly proven to be a site even more intriguing than we had first thought it to have been.

Subscribe to our quarterly newsletter

Figure 1: Digging deeper into the ditch cut in Trench 1
Figure 2: The ditch profile in Trench 1
Figure 3: Trench 1 and Trench 2 were both backfilled before the end of the day

Subscribe to our quarterly newsletter

Leave a Reply